Skip to end of metadata
Go to start of metadata
You are viewing an old version of this content. View the current version.
Compare with Current
View Version History
« Previous
Version 22
Next »
Overview:
Quantitative Data:
Link | Date Range | Item | Metric & Value | Assumption |
---|
| 00/00/2021 to 00/00/2021 (0 Days) | | Metric name | HYPOTHESES REASONING |
Competitor Research:
Function | Findings | Image | Takeaways |
---|
| | | EMBRACE REJECT TO DISCUSS |
Proposal Feedback:
Stakeholder | Date | Changes |
---|
Product | 17/03/23 | DONE ‘Connect’ sidebar item This should show even if credential manager hasn’t been configured If users navigate to ‘connect’ in sidebar without credential setup, the listing will be empty
Campaign processr < visibility for publishers Tab terminology Campaign selection (setup step) Select ‘existing campaign’ should have advertiser filter first Configration applying should be a 1 to 1 relationship, therefore the interface needs to change because you should only be able to select 1 campaign to apply the configuration to so no need for the ‘associated campaigns’ column on the listing. Users can then duplicate the campaign if they want to separate their lead delivery into multiple campaigns.
Dashboard ‘Connect’ listing ‘Job details’ for validation lists Step order changes Audit of changes Campaign level connect integration Configuration pending updates On jobs step, have column for ‘type of update’ then highlight the jobs that are new, updated, removed
Form field mapping Option to select ‘Unmapped’ if mapping is to be done later in the scenario where a different ‘mapping’ form is chosen and the field required for mapping is not available, so the field needs to be added after configuration is applied, therefore the ‘unmapped’ field allows the configure process to be completed and the field can be mapped later
Configuration listing Multiple ‘connect’ campaigns scenario
REJECTED NEED MORE INFO TO DISCUSS TO DO |
Product | 22/03/23 | DONE Handing of updates Configure dialog > mapping step Configure dialog > jobs step Job names Audit Campaign > processr Changing the linked campaign
REJECTED NEED MORE INFO TO DISCUSS TO DO |
Retrospective:
User Feedback
Stakeholder | Date | Description |
---|
| | |
| | |
Quantitative Data
Link | Date Range | Item | Metric & Value | Assumption |
---|
| 00/00/2021 to 00/00/2021 (0 Days) | | Metric name | HYPOTHESES REASONING |